Case Study: The Show Goes Up on Friday


Jamie is a production technician for a mid-sized live events company. He specs the rack, plans the cable runs, and is the person standing in the venue on Tuesday night when something isn’t right. Last month, a project came our way with a 72-hour window. A system had failed, and the existing supplier quoted a six-to-eight week lead time. A replacement needed to be configured, tested, and ready to go into the existing rack.

Jamie already knew the spec. He’d done the research. What he needed was someone who could build it and get it moving the same day.

The Build 

Jamie needed a 1U Nano with a reverse-mount chassis all IO accessible from the front, RS-232 onboard, PNY RTX A400 driving four displays. The kind of spec that takes most suppliers weeks to quote. Ours shipped in 72 hours.

RequirementOff-the-shelf supplierG2 Digital
1U reverse-mount chassisNot availableStandard configuration
RS-232 onboardAdapter requiredBuilt in
Lead time6–8 weeks72 hours
Pre-tested before dispatchNot guaranteedEvery build
UK-builtNoYes
Product packaging

Most people find us after they’ve tried everything else. Then they just call us.

If your project is live and the clock is running, configure your system here. If you want to talk it through first, our engineers will answer your call. Either way, you’re not waiting weeks for a system that should have been available yesterday.

Explore our 1U Nano View Configurations

Call us 

Email us

  Need a quick answer right now? Chat with us live using the icon at the bottom right of your screen